| 编号 | 中文名称 | 英文名称 |
|---|---|---|
| EN 45510-1-1997 | 发电站设备采购指南 第1部分:.通用条款 | Guide for procurement of power station equipment - Part 1: Common clauses |
| EN 45510-2-2-1999 | 发电站设备的采购指南 第2-7部分:电气设备 不间断电源 | Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies |
| EN 45510-2-3-2000 | 发电站设备的采购指南 第2-3部分:电气设备 固定电池组和充电器 | Guide for procurement of power station equipment - Part 2-3: Electrical equipment - Stationary batteries and chargers |
| EN 45510-2-4-2000 | 发电站设备的采购指南 第2-4部分:电气设备 大功率固定变流器 | Guide for procurement of power station equipment - Part 2-4: Electrical equipment - High power static convertors |
| EN 45510-2-6-2000 | 发电站设备的采购指南 第2-6部分:电气设备 发电机 | Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators |
| EN 45510-2-7-2002 | 发电站设备的采购指南 第2-7部分:电气设备 开关装置和控制设备 | Guide for procurement of power station equipment - Part 2-7: Electrical equipment; Switchgear and controlgear |
| EN 45510-3-1-1999 | 发电站设备采购指南 第3-1部分:锅炉 水管锅炉 | Guide for procurement of power station equipment - Part 3-1: Boilers - Water tube boilers |
| EN 45510-3-2-1999 | 发电站设备采购指南 第3-2部分:.锅炉 .火管锅炉 | Guide for procurement of power station equipment - Part 3-2: Boilers - Shell boilers |
| EN 45510-3-3-1999 | 发电站设备采购指南 第3-3部分:锅炉 流化床燃烧锅炉 | Guide for procurement of power station equipment - Part 3-3: Boilers- Boilers with fluidized bed firing |
| EN 45510-4-10-1999 | 发电站设备采购指南 第4-10部分:.锅炉辅助设备 烟道气脱氮(DE-NOx)设备 | Guide for procurement of power station equipment - Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant |
| EN 45510-4-3-1999 | 发电站设备采购指南 第4部分:锅炉辅助设备 第3节:通风设备 | Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 3: Draught plant |
| EN 45510-4-6-1999 | 发电站设备采购指南 第4部分:.锅炉辅助设备 第6节: 烟气脱硫(DE-SOx)设备 | Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 6: Flue gas desulphurization (De-SOx) plant |
| EN 45510-4-7-1999 | 发电站设备采购指南 第4部分:锅炉辅助设备 第7节: 运灰处理设备 | Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 7: Ash handling plant |
| EN 45510-4-8-1999 | 发电站设备采购指南 第4-8部分:锅炉辅助设备 尘埃处理设备 | Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant |
| EN 45510-4-9-1999 | 发电站设备采购指南 第4-9部分:.锅炉辅助设备 除烟垢器 | Guide for procurement of power station equipment - Part 4-9: Boiler auxiliaries - Sootblowers |
| EN 45510-5-1-1998 | 发电站设备采购指南 第5-1部分:.汽轮机 | Guide for procurement of power station equipment - Part 5-1: Steam turbines |
| EN 45510-5-2-1998 | 发电站设备采购指南 第5-2部分:.燃气轮机 | Guide for procurement of power station equipment - Part 5-2: Gas turbines |
| EN 45510-5-3-1998 | 发电站设备采购指南 第5-3部分:.风力涡轮机 | Guide for procurement of power station equipment - Part 5-3: Wind turbines |
| EN 45510-5-4-1998 | 发电站设备采购指南 第5-4部分:.水力涡轮机、水力、液力存储器泵和涡轮泵 | Guide for procurement of power station equipment - Part 5-4: Hydraulic turbines, storage, pumps and pump-turbines |
| EN 45510-6-1-1998 | 发电站设备采购指南 第6-1部分:.涡轮机辅助设备 脱气器 | Guide for procurement of power station equipment - Part 6-1: Turbine auxiliaries - Deaerators |
| EN 45510-6-2-1998 | 发电站设备采购指南 第6-2部分:涡轮机辅助设备 给水加热器 | Guide for procurement of power station equipment - Part 6-2: Turbine auxiliaries - Feedwater heaters |
| EN 45510-6-3-1998 | 发电站设备采购指南 第6-3部分:涡轮机辅助设备 冷凝设备 | Guide for procurement of power station equipment - Part 6-3: Turbine auxiliaries - Condenser plant |
| EN 45510-6-4-1999 | 发电站设备采购指南 第6-4部分:涡轮机辅助设备 泵 | Guide for procurement of power station equipment - Part 6-4: Turbine auxiliaries - Pumps |
| EN 45510-6-5-1999 | 发电站设备采购指南 第6-5部分:涡轮机辅助设备 干式冷却系统 | Guide for procurement of power station equipment - Part 6-5: Turbine auxiliaries - Dry cooling systems |
| EN 45510-6-6-1999 | 发电站设备采购指南 第6-6部分:涡轮机辅助设备 湿式和湿/干式冷却塔 | Guide for procurement of power station equipment - Part 6-6: Turbine auxiliaries - Wet and wet/dry cooling towers |
| EN 45510-6-7-1998 | 发电站设备采购指南 第6-7部:涡轮机辅助设备 潮气分离回热炉 | Guide for procurement of power station equipment - Part 6-7: Turbine auxiliaries - Moisture separator reheaters |
| EN 45510-6-8-1999 | 发电站设备采购指南 第6-8部分:涡轮机辅助设备 起重机 | Guide for procurement of power station equipment - Part 6-8: Turbine auxiliaries - Cranes |
| EN 45510-6-9-1999 | 发电站设备采购指南 第6-9部分:涡轮机辅助设备 冷却水系统 | Guide for procurement of power station equipment - Part 6-9: Turbine auxiliaries - Cooling water systems |
| EN 45510-7-1-1999 | 发电站设备、设备和系统的采购指南 第7-1部分:管道系统和阀门 高压管道系统 | Guide for procurement of power station plant, equipment, and systems - Part 7-1: Pipework and valves - High pressure piping systems |
| EN 45510-7-2-1999 | 发电站设备、设备和系统的采购指南 第7-2部分:管道系统和阀门 锅炉和高压管道阀 | Guide for procurement of power station plant, equipment, and systems - Part 7-2: Pipework and valves - Boiler and high pressure piping valves |
| EN 45510-8-1-1998 | 发电站设备的采购的指南 第8-1部分:控制和测试设备 | Guide for procurement of power station equipment - Part 8-1: Control and instrumentation |
| prEN 45510-2-1-2000 | 发电站设备的采购指南 第2-1部分::电气设备 电力变压器. | Guide for procurement of power station equipment - Part 2-1: Electrical equipment; Power transformers |
| prEN 62270-2001 | 用于水利发电厂自动化的计算机控制的IEEE指南 | IEEE Guide for computer-based control for hydroelectric power plant automation |
| 编号 | 中文名称 | 英文名称 |